Occasional thoughts and deeds of an Engineer
RSS icon Email icon Home icon
  • 2 boat n back

    Posted on April 17th, 2009 cwmoore No comments

    Fred & I went up to the boat to do some pre-launch work. Fred specialized in the water line stripe and I continued work on the rub rail varnishing. We left Thursday morning early and arrived around 1100 hrs. By the time we quit for the evening at around 1830 hrs we had finished the first coat of the water line and done the rub rails. We then proceeded to The Butler to demolish a Sizzler Steak meals and after the meal went to Oval Beach to watch the sun go down over the water. It was an absolute beautiful day and great sundown.

    Today we were at the boat early again and finished about 1400 hrs. Fred did the stripe alone and I concentrated on the rub rail gloss coat of Cetol. Another beautiful day better that yesterday if that is possible.

    Great work guys – even if I do say so myself. On the return we shied away from Interstates and traveled back roads through Three Rivers, Centerville, Sturgis and back home.